The Canadian edition Canada
PolarisNews

Local & Municipal

Victoria Trail Bridge Closure Set for Oct. 8 Grand Opening

Sturgeon County will close Victoria Trail between Range Road 211 and Township Road 570A for the bridge's grand opening.

Road closed to through traffic barricade on a forest road
Library photo Road closed to through traffic barricade on a forest road. Does not depict this event. User:Kaleodu / CC0. Resized; may be cropped for display. Photo source Photo licence

Sturgeon County will fully close Victoria Trail between Range Road 211 and Township Road 570A on Thursday, Oct. 8, 2026, from 8:30 a.m. to 11:00 a.m., according to a notice published by the county on Oct. 2, 2026.1

The closure covers the Victoria Trail Bridge, where Transportation & Engineering Services will hold the grand opening of the newly constructed bridge, the notice says.1

Prepared with reporting tools under our editorial standards. Our editorial approach.

Sources

  1. FULL ROAD CLOSURE: VICTORIA TRAIL BETWEEN RANGE ROAD 211 AND TOWNSHIP ROAD 570A · Sturgeon County

Comments

No comments yet.

Comments are read by a person before they appear. Please keep to the subject of the article. We remove abuse and anything that could identify a person protected by a publication ban.