Local & Municipal
Eastbound Cook Road in Kelowna closed Oct. 26 for concrete pour
The City of Kelowna says the eastbound direction of Cook Road will be fully closed from 7 a.m. to 4 p.m. on Monday, Oct. 26, 2026, with local traffic only and a detour in place.
Kelowna, BC
Eastbound Cook Road will be fully closed on Monday, Oct. 26, 2026, from 7 a.m. to 4 p.m., the City of Kelowna said. The closure allows for concrete pump setup at 7:30 a.m. ahead of a concrete pour.1
The city said local traffic only will be permitted through the closure, and a detour will be in place.1
AI-assisted reporting under human editorial direction. Our editorial approach.
Comments
No comments yet.